Projects
See the wealth of possibilities with HAKI’s range of innovative, modern products in these projects from across the globe
-
High-level birdcage scaffold for Waterloo Station
HAKI and CCS Scaffolding were engaged by Wessex Capacity Alliance – a collaboration be-tween Skanska UK, Mott MacDonald, AECOM, Colas Rail – to provide safe, temporary access solutions at Waterloo Station, while around £400m worth of improvements are made.
-
HAKI Stair Towers scale Edinburgh Castle (via Lyndon Scaffolding)
Lyndon Scaffolding used a 24m high HAKI Stair Tower to allow for the removal of an old and installation of a new flagpole at Edinburgh Castle.
-
Rolling aluminium scaffold solution used for Hålogaland Bridge construction
HAKI AS was proud to be involved in the build of the Hålogaland Bridge in Norway. We delivered a roll-able scaffolding solution that allowed important works to be carried out to the underside of the bridge.
-
HAKI speeds up programme for Swindon Rail Track Upgrade
HAKI provided a temporary bridge suitable for public access whilst the rail track was upgraded. The bridge was positioned with only 15 minutes of possession time.
-
HAKI Universal circular scaffold used for Højsager Mill restoration
Principal contractor for the project, C.Palle, chose HAKI Universal system scaffolding to overcome the difficulties usually involved in building a circular scaffold.
-
Enigma partners with HAKI to deliver high-profile Ropeworks project
Throughout 2018, a substantial 280 tonnes of HAKI Universal Scaffolding, Stair Towers and Loading Towers – the single biggest HAKI job undertaken by Enigma Industrial Services in Edinburgh – has been erected on the Ropeworks site.
-
HAKI engineers temporary access solution for pedestrian tunnel
HAKI provided an access solution to Barberens Stilladser A/S using the unique puncheon & beam rider, to cover a pedestrian tunnel for the Køge Nord project.
-
450 tonnes of HAKI used in Johan Sverdrup development
Kvaerner ordered HAKI to deliver 450 tonnes of Universal Aluminium to the Johan Sverdrup project during 2018, to enable contracted works to be carried out.
-
HAKI Public Access Stairs (PAS) erected at Parliament Hill School
Farrans Construction chose HAKI Universal Scaffolding and Public Access Stair (PAS) to provide a temporary access solution at Parliament Hill School in Highgate, London, while new build and renovation works were carried out.
-
HAKI collaborates on Hurtigruten shipbuilding
HAKI has supplied approximately 250 tonnes of Universal scaffolding to Kleven Verft AS, for the Hurtigruten shipbuilding in Norway.
-
HAKI towers the MÆRSK Inspirer with 60 meter-high scaffold
The scaffolding for maintenance work on MÆRSK INSPIRER is supplied by HAKI A/S, in close collaboration with SEMCO MARITIME A/S.
-
CETAC tank maintenance enabled with HAKI circular scaffold
The client had limited time to erect the scaffold, carry out the inspection and remove the scaffold again. And there were issues getting around an outside staircase and pipes on the ground.